Data centres do not all use one cost-based valuation method. The published Rating Manual identifies a rental approach for many older facilities, a “rentals plus” approach for modern adapted premises, and an additional contractor’s-basis valuation for rateable plant and machinery.
- Data centre business rates valuation depends on the facility’s physical characteristics.
- Older adapted buildings normally use relevant rental evidence where the Manual’s conditions are met.
- Modern facilities normally use local warehouse rental levels plus an uplift for fitted high-specification space.
- The 2026 practice note values qualifying unfitted expansion areas at nil until fitted out.
- Only rateable plant belongs in the additional plant valuation; not all equipment is rateable.
How are data centres valued for business rates?
The Rating Manual’s Computer centres section and 2026 practice note explicitly say that a single valuation basis cannot be applied across the class. Age, construction, adaptation and fit-out determine the appropriate approach.
For the 2026 rating list, paragraphs 4.1–4.6 of the practice note distinguish older premises, modern adapted warehouse or light-industrial premises, unfitted expansion areas and rateable plant. Do not describe the whole assessment as replacement cost simply because it contains substantial plant.
The guide to calculating rateable value provides background, but the property-specific Manual guidance governs the detailed checks below.
| Component or facility | Approach identified in the Manual | Main check |
|---|---|---|
| Older or first-generation adapted premises | Normally a rental approach based on appropriate local alternative-use levels, subject to the stated conditions | Confirm physical characteristics and suitability of comparisons |
| Modern adapted warehouse or light-industrial premises | Normally “rentals plus” for fitted data halls and other high-specification areas | Check the local rental basis, uplift and areas receiving it |
| Qualifying unfitted expansion areas | Nil value until fitted out under the 2026 practice note | Prove the actual extent and state of fit-out |
| Rateable plant and machinery | Additional contractor’s-basis valuation using the Cost Guide | Establish rateability and avoid duplication |
Older facilities: test the rental approach
Paragraph 4.2 addresses older or first-generation centres. These can be adapted warehouses or offices capable of an alternative use within the relevant rating assumptions. The preferred approach is rental comparison using the appropriate local level for that alternative use, in line with the previous-list approach.
That is not permission to choose the cheapest warehouse nearby. The comparisons must fit the actual property and the conditions described in the guidance.
Check:
- Whether the building is genuinely comparable to the premises relied upon.
- Its age, construction, configuration and adaptations.
- The rental evidence and adjustments underlying the adopted rate.
- Whether the valuation follows the approach appropriate to that facility.
Modern facilities: understand “rentals plus”
Paragraph 4.3 of the 2026 practice note identifies “rentals plus” as the preferred approach for modern centres in significantly adapted warehouse or light-industrial buildings. It starts with the prevailing local distribution warehouse rental level and applies an uplift to fully fitted data halls and other high-specification areas.
The published 2026 practice note does not set out a single universal uplift figure. Do not import a percentage from an older practice note or another locality without establishing that it applies.
The important checks are:
- The base rental level: identify the warehouse evidence being used.
- The uplift: obtain the amount applied and its justification.
- The fitted area: match the valuation to actual completed fit-out.
- Other high-specification space: establish what is included and why.
- Other components: review air conditioning, parking and additional land under the property’s applicable approach.
Paragraph 4.5 says that, for each property, the 2023 approach to air conditioning, car parking and additional land should be adopted for the 2026 list. That makes the facility’s existing valuation record relevant; it does not establish that every component across every centre is valued identically.
Unfitted expansion areas need separate attention
Data centre operators often reserve internal space for future expansion. Paragraph 4.4 says these fallow areas should be valued at £0 until fitted out to the standard required to meet local demand for accommodation of that type.
This is a specific treatment for qualifying unfitted expansion space, not a general exemption for empty or underused fitted halls. A fully fitted hall does not become fallow simply because it has spare commercial capacity.
For a 2026 review, retain:
- Plans distinguishing fitted halls from future expansion space.
- Dated photographs showing the actual state of each area.
- Fit-out contracts and completion records.
- A chronology of phased works.
- The valuation areas and dates to which the alleged error relates.
The evidence should establish the space’s condition, not just the operator’s intention to use it later.
Rateable plant is an addition, not the whole method
The 2026 practice note separately directs that rateable plant and machinery be valued on the contractor’s basis, using the Valuation Office Cost Guide. It also recognises that centres contain both rateable and non-rateable equipment.
Equipment is not automatically rateable merely because it is essential to running the data centre. Its treatment must be tested under the plant and machinery rules.
Review the plant schedule item by item:
- Identify the actual equipment and relevant specification.
- Establish the basis for treating each item as rateable.
- Check the cost and any applicable adjustments.
- Confirm that items have not been counted twice.
- Reconcile the plant addition with the building valuation.
Do not assume that all cooling, power or computing equipment receives the same treatment. Equally, do not exclude an item simply because it is owned by an occupier rather than the building owner.
Measure the property consistently
The Computer centres section specifies gross internal area, the area measured within the external walls under the relevant measuring rules. Compare the valuation with plans prepared on the same basis.
A useful schedule separates data halls, high-specification support accommodation, ordinary accommodation and fallow areas. The purpose is to explain the assessment, not to create unsupported exclusions.
A difference between a lease plan and the valuation is a reason to investigate. It is not proof of error until the extent and measuring conventions have been reconciled.
What does the 2026 rating list change?
The 2026 rating list took effect on 1 April 2026, with a valuation date of 1 April 2024. Use its practice note when reviewing the current list; earlier notes remain relevant only where the current guidance refers back to them or an earlier assessment is under review.
Rateable value is not the annual bill. The council applies the appropriate multiplier and other billing adjustments, with separate rules in England and Wales. Obtain the calculation for the actual premises rather than applying one assumed multiplier to every centre.
How to challenge an incorrect assessment
England and Wales use Check, Challenge, Appeal for the 2023 rating list onwards. Begin by identifying whether the issue is a factual error, a disputed valuation input or a council billing matter.
- Correct recorded areas, fit-out facts or equipment details with supporting evidence.
- Explain why the proposed method or input follows the applicable Manual guidance.
- State the alteration sought and show how the evidence changes the calculation.
- Check the procedural requirements and deadline on the actual case.
- Keep paying as billed unless the council confirms a different arrangement.
A challenge does not guarantee a reduction. An assessment can be confirmed or increased as well as reduced.
How Appeal My Rates UK can help
Appeal My Rates UK provides rating surveyor support for data centre owners and occupiers with business rates valuation challenges and council disputes in England and Wales. We begin with a free, no-obligation audit, followed by a written report and a quote if there is a case.
Most of our work is no win, no fee, but some instructions carry fixed fees. Confirm the fee basis, scope and payment terms for your instruction in writing through the contact page.
FAQ
Are all data centres valued on the contractor’s basis?
No. The Computer centres guidance identifies rental and rentals-plus approaches for buildings, with a separate contractor’s-basis addition for rateable plant and machinery. The appropriate treatment depends on the property.
What does rentals plus mean for a data centre?
The 2026 practice note describes an uplift on the prevailing local distribution warehouse rental level for fully fitted data halls and other high-specification areas. It does not publish one universal uplift for every facility.
Are unfitted expansion areas included at full value?
The 2026 practice note says qualifying fallow areas should be valued at £0 until fitted out to the required standard. This is not a blanket exclusion for spare capacity in fitted halls.
Is all essential data centre equipment rateable?
No. The guidance recognises both rateable and non-rateable plant. Each item needs to be considered under the applicable plant and machinery rules.
What measurement basis applies to computer centres?
The Manual specifies gross internal area. Plans and valuation areas must be compared using consistent measurement rules and the correct property extent.
How do I challenge my data centre’s assessment?
Use Check, Challenge, Appeal where applicable, with evidence identifying the disputed property facts or valuation inputs. England and Wales both use this framework for the 2023 rating list onwards.
Will a valuation challenge suspend my bill?
No. Continue paying as billed unless the council confirms a different arrangement. A valuation case and the council’s collection of the bill are separate matters.
One last thing
For a phased 2026 development, a dated fit-out plan can be more useful than a headline construction budget. It shows exactly which areas the valuation should treat as fitted accommodation and which require separate consideration under the fallow-area guidance.